Whole lotta action at the brewery this week.  Here’s the quick summary:

  • We built two farmhouse tables, six benches, a bar height table, and started framing the bar and finishing the newly constructed furniture (Video below.  Huge shout out to my wife for all her help!!!)
  • The steel that will soon be made into our brewery tanks is on it’s way from Italy!  It’s currently on a cargo ship called the Seaspan Dalian in port in France
  • Preparations for the new brewery and walk-in pads continued with base rock going down and rebar and dowel installation
  • We have lights!  And light switches! And power outlets!  And they all work!

Things are moving right along with plenty more milestones to come!

Cheers,

The Hapa’s Brewing Team